翻訳と辞書
Words near each other
・ Upper Kedron, Queensland
・ Upper Kenilworth Avenue (Hamilton, Ontario)
・ Upper Kennetcook, Nova Scotia
・ Upper Kent Aerodrome
・ Upper Kent, New Brunswick
・ Upper Keremeos, British Columbia
・ Upper Keuper
・ Upper Kiamichi River Wilderness
・ Upper Kintla Lake
・ Upper Kintla Lake Patrol Cabin
・ Upper Kintore, New Brunswick
・ Upper Kirby
・ Upper Klamath Lake
・ Upper Klamath National Wildlife Refuge
・ Upper Knowle
Upper Kotmale Dam
・ Upper Krishna Project
・ Upper Kru Coast District
・ Upper Kuskokwim language
・ Upper Kuskokwim people
・ Upper Kutinga
・ Upper Kuttanad
・ Upper La Tante
・ Upper La Taste
・ Upper Lachlan Shire
・ Upper LaHave, Nova Scotia
・ Upper Lake
・ Upper Lake High School
・ Upper Lake McDonald Ranger Station Historic District
・ Upper Lake, California


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Upper Kotmale Dam : ウィキペディア英語版
Upper Kotmale Dam

The Upper Kotmale Dam (also known as the Upper Kotmale Hydropower Project, or UKHP) is located in Talawakele, within the Nuwara Eliya District, in the Central Province of Sri Lanka.〔(【引用サイトリンク】url=http://www.ukhp.lk/location.html )〕 The dam feeds the third largest hydroelectric power station in the country.
== History ==

The project was initially planned in 1968 by the local authorities, before the Government of Japan funded a study between 1985 and 1987 to further examine the hydroelectric potential in the upper reaches of Kotmale River. The feasibility study included five sites and eight alternative development schemes, and concluded with two sites which were more technically and economically feasible.
The two sites were a conventional type at Caledonia, and a run-of-the-river type at Talawakele. The project at Caledonia involved the displacement of over 2,700 families and inundation of large areas of land used for tea plantations, and thus the Caledonia site was dropped. Further funding was then provided by Japan for the engineering study, which included a review of the feasibility study, selection of an optimal development plan, development of the detailed design, and the preparation of tender documents and an environmental impact assessment report.
The environmental impact assessment report was completed in September 1994, with the final design report completed in March 1995. The environmental assessment identified key issues associated with the project, which includes impact on St. Clair's Falls aesthetics due to stream flow reductions, social impacts due to resettlement of affected people, possible effects on ground water due to tunnelling, impacts on downstream water uses due to de-watering of streams, and impacts on biodiversity. These impacts led large delays in project development.
As per the National Environmental Act of 1998, the environmental clearance was then granted to the project. The project initially faced several objections, before being officially permitted by courts of law. Construction work on the project then began in 2006, and is expected to be completed by the end of 2011.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Upper Kotmale Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.